Our Team

Mike Penny

President of PBW High Voltage.

Mike has more than thirty years of experience in the High Voltage industry.  Prior to forming PBW High Voltage Ltd., Mike was the Vice-President and General Manager of Powerline Construction in Markham, Ontario.

 

Peter Sandford

Special Projects manager

Peter has solid hands-on and managerial background in utility operations. Peter is well-versed in steam, diesel and combustion turbine generation, as well as the management of municipal electrical distribution systems.  Peter has a solid utility background.

Eric Harris

Manager of Engineering

Eric is a Professional Engineer, and is a member in good standing of the Professional Engineers Ontario (PEO). He has over 25 years of sales, marketing and application engineering experience in electric power switching and protection with one of the leading manufacturers of medium and high voltage equipment. Eric is responsible for the overview of PBW’s specifications and designs. He is also available to assist OEM’s, Consultants and Owners in the design of their power system requirements.