Projects

Golden Eye

  • PBW drilled the Core foundation wall.
  • Constructed transformer, switchgear and generator foundations.
  • PBW supplied and installed eight precast manholes.
  • Contracted the duct banks to meet the sites specifications.
  • Installed and supplied direct buried rigid PVC conduit to each of six transformer foundations and four future foundations.

 

1417
1421
1419
1418