Projects

IBM Canada, Toronto

  • Created a cable bus system for the existing generators
  • The cable bus duct system was partially located in a subgrade ventilated poured-in-place steel reinforced concrete trench. The proper cables were selected in order to meet the requirements of Ontario Electric Safety Code.

 

100-0379
006