Mohawk Raceway, Milton

  • PBW relocated the incoming 27.6kV electrical service closer to the roadway by supplying and installing two new poles.
  • PBW supplied and installed new substation as per specifications which included; Medium voltage 27.6kV main load break switchgear, duck banks with appropriate conduit from the load side of the fused disconnect to customer.
  • Supplied and installed 21M x 23M ground which included an initial ground study.

 