Royal Victoria Hospital, Barrie

  • 44KV free standing terminal poles with fused load interrupter switches were installed to specifications.
  • Installed necessary bus duct.
  • Supplied 5MVA transformers.
  • Supplied and installed the two bays of 15KV switchgear which included the necessary connections and bus ducts.
  • Removal of the existing polyline including the incoming terminal pole and fuse pole feeding the existing 44KV S&C switchgear.
  • Performed all necessary studies associated with the job which include; grounding study, fault current analysis.